With a key objective to ensure the project was finalised in time for a pre-booked event, works included strip out of existing kitchen back-to-bare; installation of all new joinery, island bench, stone bench tops, splashback, appliances and laminate flooring; installation of new plumbing and electrical services; replacement of existing ceiling; painting of new surfaces; new floors, walls and ceilings; replacement and new plumbing fixtures; replacement and new lighting.