With Stage 1 completed in 2018, Stage 2 delivered refurbishment of existing sash windows on the first and second floors, alterations to the Hawthorn Artists Society, construction of a new airlock to create a feature entrance and control ingress of wind to the Art Gallery Foyer, reconfiguration of the Headspace and 360 tenancies on the first floor to create more useable and functional spaces.