Harris HMC was engaged to construct a two-storey music, drama and dance building at St Francis Xavier College in Officer. The works comprised a partial demolition of the existing gym building. During construction the team faced many challenges connecting into the existing building that required a flexible and adaptive approach to rapidly develop solutions.