Manningham Function Centre

Location

699 Doncaster Road, Doncaster

Duration

February – July 2021

Value

$800,000

Client

Manningham City Council
Architect
Avor Architecture
Complete refurbishment of the Manningham Function Centre.

This project significantly increased the centre’s capacity and upgraded it into a modern venue to be used by the Council and local community. Located on level two of the existing and fully operational council civic centre, public safety and minimising disruption during opening hours were a key concern.

Works included demolition and removal of all existing amenities to be replaced with new elements including carpet, joinery, wall panelling, light fixtures, signage and DDA compliant / gender equitable toilet facilities; hearing loop technology system; installation and integration into the lighting control system of over 250 downlights; painting throughout; and significant upgrade to AV, electrical, mechanical, hydraulic and fire services.

Manningham Function Centre

Location

699 Doncaster Road, Doncaster

Client

Manningham City Council

Duration

February – July 2021
Architect
Avor Architecture

Value

$800,000
Complete refurbishment of the Manningham Function Centre.

This project significantly increased the centre’s capacity and upgraded it into a modern venue to be used by the Council and local community. Located on level two of the existing and fully operational council civic centre, public safety and minimising disruption during opening hours were a key concern.

Works included demolition and removal of all existing amenities to be replaced with new elements including carpet, joinery, wall panelling, light fixtures, signage and DDA compliant / gender equitable toilet facilities; hearing loop technology system; installation and integration into the lighting control system of over 250 downlights; painting throughout; and significant upgrade to AV, electrical, mechanical, hydraulic and fire services.

testimonial-empty

Here are some other projects we think you'd like

Other projects completed with Manningham City Council

No data was found

Ready to partner with us?

Search

52 Henderson Street
North Melbourne VIC 3051

+61 3 9328 8900
enquiries@harrishmc.com.au

Follow us on social media

Stay Connected
Search