The project involved improvements to the common areas of this two-level facility built with a footprint that resembles a cross. This layout enabled strategic staging to ensure the safety of residents throughout works delivery – a huge challenge considering the implications of COVID-19 during Melbourne’s 2020 lockdowns and the vulnerability of some of the higher-care residents.