The project comprised the demolition, construction and refurbishment of a 1380m2 single storey building following a fire ignited by a ruptured gas main. It required the removal of damaged material, rebuilding and an internal refurbishment to organise the interior spaces to suit the growing school’s population. The client had a rigid handover date as temporary demountables had to be handed back within a specified timeframe.