The new space includes 14 learning areas, two staff rooms (one per level) and communal spaces/breakout areas for collaborative working. A key outcome was refurbishing and integrating the existing with the new, overcoming significant challenges of sustainable reuse and fire separation. The internal space of the two existing levels have been radically reorganised by demolishing all internal partitions and increasing the floor plates via an extension of the building on both the east and north side.