Construction – YVG Maths and Science Centre

6 May, 2015

Harris HMC recently completed the construction of a new Maths and Science Centre for Yarra Valley Grammar School.

The new 2-storey, 3,000m2 building uses the latest concept in Environmentally Sustainable Design (ESD) and features:

  • a lecture theatre with retracting seats;
  • multiple science laboratories;
  • general learning areas and breakout areas;
  • perforated sun shades around the perimeter of the building;
  • minor landscaping works; and
  • the installation of a programmable building automation system that will allow central control of air-conditioning, lighting, and motorised windows.